Suggestions for setting approx 100 monitoring points in concrete block walls on top and bottom of walls. Thinking reflective stickers with some kind of waterproof epoxy because the surface is not flat, and the walls are usually wet(Seattle). Most of the tops can set a lead and tack. In some areas thinking of using Benchtie nails in the cracks on some of the bottoms of walls due to not having much space away from walls to see the reflective stickers. Points are to be monitored for at least 3 years so semi permanent points. Thanks in advance!