Civil 3D Point Group Problems  

Page 2 / 2

BlitzkriegBob
Posts: 205
Member
(@blitzkriegbob)
100+ posts
Joined: 5 years ago

I've never encountered any issues with keeping point groups populated.

Do you use wildcards with all of your description keys?  Were the files corrupted prior to the point groups becoming corrupted?  Did you run an audit?

Reply
Steven Metelski
Posts: 169
Member
(@steven-metelsky)
100+ posts
Joined: 1 year ago

We've gone with point ranges with our groups and used layers as well. I'm not sure what the best method is though.

Control = 1-999

Locations = 1000-9999

Proposed = 10,000-14,999

Collected = 15,000 +

We then have layers.

I myself prefer point groups and layers, but I just sign things and use cad to check/setup and resolve. I no longer draft.

Reply
Jaccen
Posts: 68
Member
(@jaccen)
50+ posts
Joined: 7 months ago

We just adopted the MTO (Ontario DOT) point ranges per their manual:

https://www.library.mto.gov.on.ca/SydneyPLUS/Sydney/Portal/default.aspx?component=AAAAIY&record=8c7cd6ea-160a-4986-a91b-d2defec19967

"6.1.5 Point Numbering
Keeping to a consistent scheme of assigning blocks of point numbers helps expedite organizing data collection over several days, and CAD work later on.
The following point numbering scheme is strongly recommended:
Alignment Points of Intersection (PI’s) 1-99
Horizontal Project Control 100-299
Vertical Project Control 300-599
Primary Horizontal Control 600-699
Primary Vertical Control 700-799
Corridor boundary monuments 800-999
Topographic features 1000-
Topographic features will be further separated into point ranges so that the collection method can
be readily identified by the point numbering scheme i.e.
Total Station 1000- xxxx
RTK, RTN yyyy-zzzz
Lidar derived aaaa-bbbb
The point numbering system shall be clearly outlined in the Drafting Report (section 9.4.3)."

 

Worked well for small to medium sized jobs.  On very large ones, we just multiplied the ranges by 10.  We also separated things out by layers.

 

As to the original question--no idea.  I've never had that happen.  Only thing I can think of is a conflict in the definition of the groups and the order being changed (ie. which group had priority over the other due to the definition of the groups).

Reply
A Harris
Posts: 8155
Member
(@a-harris)
5,000+ posts
Joined: 9 years ago

I've been connecting many projects together for 40+ years and some of my files have 5k points and I have found it difficult to use such a numbering system.

I do attempt to keep one individual and adjoining tracts within a certain numbered sequence and that is difficult on some files.

This is an important issue and will help identify which group a point is by its number.

👍

Reply
Page 2 / 2
Default
:)
:d
:wink:
:mrgreen:
:neutral:
:twisted:
:arrow:
:shock:
:???:
:cool:
:evil:
:oops:
:razz:
:roll:
:cry:
:eek:
:lol:
:mad:
:sad:
:!:
:?:
:idea:
:hmm:
:beg:
:whew:
:chuckle:
:silly:
:envy:
:shutmouth: