Setting points in concrete floor
In the next month or so I need to layout a sidetrack that is going to go into a building for about 500 feet. I will be giving them an offset to centerline. The issue is is that will be a lot of construction traffic in the area that the offsets will be in. Usually for interior layout I use tape on the floor or marker and possibly some clear coat to spray over the marks. I don’t think this will work because of the high traffic and construction activities in the building during the rail construction. I’m going to propose that they let me drill small holes along the offset line that way if the labels get worn away, the offset marks will still be there. What do you guys think about that idea or do you think there is a better way to go about this?
Thanks in advance.